Building works outside the Rothermere American Institute, 21st June 2022

[UPDATE: The excavation works have been completed. We would like to thank readers for their patience and understanding. 17/06/2022]

Essential excavation works will be occurring outside the perimeter of the Rothermere American Institute building, on Tuesday, 21st June, 8am-5pm. There will be minimal and intermittent disruptive noise from the works.

University employed contractors will be required to perform excavation works around the RAI building. The VHL and RAI were informed that this work will be occurring on Tuesday 21st June, starting at 8am, and expecting to finish at 5pm. The works will involve intermittent drilling, and there will be some noise disruption, which will be kept to a minimum level throughout.

The works will not affect access into the RAI building, and the VHL will remain open as advertised.

It is recommended that readers avoid sitting near the windows, particularly on the north side of the library. Readers are also welcome to ask for earplugs, which are provided for free at the enquiry desk.

We apologise for the short notice, and for any inconvenience or disruption caused to readers.

If you have any further questions about working in the Vere Harmsworth Library, please ask at the Information Desk, or email vhl@bodleian.ox.ac.uk. For further information about the works, email Bethan Davies, VHL Librarian at bethan.davies@bodleian.ox.ac.uk.

Building works outside the Vere Harmsworth Library

[UPDATE: The construction works on the concrete have been completed, with only intermittent background noise expected until the 5th May. Windows on the north side of the building can now be opened. We would like to thank readers for their patience and understanding. 11/04/2022]

Essential construction works will be occurring on the Direct Labour Organisation (DLO) offices outside the Rothermere American Institute building, with the most disruptive works occurring from the 28th March-8th April 2022 (approx). The construction works will be located on the north side of RAI (facing South Parks Road and the Archaeology building).

The DLO has informed the RAI and VHL that essential works on the DLO offices will be taking place from the 21st March -5th May 2022. The most disruptive period of the construction works will occur approximately 28th March-8th April, when the construction workers will be breaking up concrete. This work will be noisy and create dust. After this period, the works should be less disruptive, although there will be some general background noise.

The works will not affect access into the RAI building, and the VHL will remain open as advertised.

The VHL and RAI have been told that the construction workers will be putting in place mitigations to reduce the volume of dust whenever possible. However, because of this, the windows on the north side of the building will be kept closed, to avoid dust clouds coming into the library. The windows on the south side of the building (facing Mansfield College and the Princess Margaret Gardens) will be opened by staff, in line with University and Bodleian Libraries guidance, but may be closed by readers if they wish.

To reduce noise disruption when working in the library, readers are recommended to avoid sitting near the windows on the north side of the library. Readers are also welcome to ask for earplugs, which are provided for free at the enquiry desk.

We apologise for any inconvenience or disruption caused to readers.

If you have any further questions about working in the Vere Harmsworth Library, please ask at the Information Desk, or email vhl@bodleian.ox.ac.uk. For further information about the DLO construction works, email Bethan Davies, VHL Librarian at bethan.davies@bodleian.ox.ac.uk.

Announcement: VHL closure on April 30th, 2021 (morning only)

The Vere Harmsworth Library (VHL) will be closed for the morning of April 30th, 2021, due to essential electrical works across the Rothermere American Institute (RAI) building.

The VHL expects to re-open from 1:30pm, for the beginning of the afternoon study sessions (1:30pm – 5:00pm), and remain open until the end of the evening sessions (5:30pm-9:00pm). We will aim to update readers of any changes to these plans as soon as possible via our Twitter account.

VHL study spaces and Browse and Borrow slots for the morning of April 30th have been removed on SpaceFinder, alongside collection slots for RSL and VHL material via Click and Collect. Readers wishing to return their books in the morning may use the Returns hubs based around Oxford.

We apologise for any inconvenience caused. If you have any questions about the expected closure, please email vhl@bodleian.ox.ac.uk.

 

RSL Decant: Planned closure of the VHL on Saturday 18th January

The Vere Harmsworth Library will be closed on Saturday 18th January, 2020. This is to allow for unavoidable work on the Ground Floor of the Library.

As part of the RSL Decant to VHL Project 2020-21, works will need to be carried out by the ground floor entrance of the Vere Harmsworth Library. This will mainly be focused on the installation and set up of the new access control gates.

The RSL Decant Project Team and construction workers have advised the Vere Harmsworth Librarian that access into the Vere Harmsworth Library Ground Floor entrance will be blocked whilst this work is in progress. It will also be disruptive to Library services, and include a significant amount of noise and mess.

After careful consideration of the above information, and of alternative methods of entry into the Library, the Vere Harmsworth Librarian has agreed to close the Library on the 18th of January, to ensure that work can be completed as swiftly as possible.

The Library will re-open on Sunday 19th January (11 am – 5pm), subject to the completion of the works. The Librarian will aim to update Readers on the progress of the works as soon as possible.

We will aim to provide information on any further works in the Library via this blog, the Twitter (@vhllib) and Facebook (@vereharmsworthlibrary) accounts, and by email.

We apologise for any disruption or inconvenience caused to Readers at this time.

Further information on the proposed book moves and a title list of relegated journals and reference titles can be found in the RSL Decant Consultation documents on the VHL website. 

If you have any further questions about working in the Vere Harmsworth Library, please ask at the Information Desk, or email vhl@bodleian.ox.ac.uk. For further information about the RSL Decant, email Bethan Davies, VHL Librarian at bethan.davies@bodleian.ox.ac.uk.

RSL Decant: Planned works on Thursday 9th January, some disruption expected – UPDATED

UPDATE: (15/01/2020) The enquiry desk has now been installed and set up for use. Both RSL and VHL library staff are manning the desk, ready to answer your queries, alongside RAI related enquiries. Some minor works will still be occurring at the desk area as we settle in.

PREVIOUS UPDATE (10/01/2020): Work on the enquiry desk has continued into Friday morning (10th January). The works are expected to continue for the rest of today. The temporary Enquiry Desk (located on the right as you enter the Ground Floor) will remain in use for the rest of the day.

As part of the RSL Decant to VHL Project 2020-21, works will need to be carried out by the ground floor entrance of the Vere Harmsworth Library, to install and set up the new Enquiry Desk.

The RSL Decant Project Team and construction workers will be moving and installing the new desk on the morning of Thursday, 9th January, 2020.

The Librarian has been advised that the majority of the physical moving, and noisiest part of the works, will aim to be completed by 9 am, when the Library is expected to open. By this point, the entrance to the Vere Harmsworth Library Ground Floor should be clear for readers to enter.

Work on the newly installed desk, however, would continue, including setting up electronic and internet points. Therefore, in the interim, library staff will be based on a temporary enquiry desk, which will be set up on the Ground Floor. This will allow for readers to check out books, and for staff to respond to any further enquiries.

Readers are advised that whilst the most disruptive part of the planned works will be occurring before the Library opens, there will be some noise on the Ground Floor of the Library whilst during the morning.

The newly installed desk should be completed and ready to use from the Thursday afternoon.[UPDATE: The desk has now been installed and is in use. See first Update above at the top of the page.]

The Librarian will aim to update readers on the progress of the works as soon as possible. We will aim to provide information on any further works in the Library via this blog, the Twitter (@vhllib) and Facebook (@vereharmsworthlibrary) accounts, and by email.

We apologise for any disruption or inconvenience caused to readers at this time.

Further information on the proposed book moves and a title list of relegated journals and reference titles can be found in the RSL Decant Consultation documents on the VHL website. 

If you have any further questions about working in the Vere Harmsworth Library, please ask at the Information Desk, or email vhl@bodleian.ox.ac.uk. For further information about the RSL Decant, email Bethan Davies, VHL Librarian at bethan.davies@bodleian.ox.ac.uk.

VHL Update: Library open with full services

Following the leak and shut-down of electrics in the RAI and VHL on Sunday and Monday, I am pleased to announce that we have full power restored to the Library across all floors.

As of Wednesday 13th November, we will resume our standard term opening hours. This includes:

  • Weekdays 9am-7pm
  • Saturdays 10am-4pm
  • Sundays 11am-5pm.

The Library will therefore be open tonight until 7pm.

Electricians will still need to come into the Library to finish their works. The Library will inform our readers of any potential disruption to their work caused by this.

We would like to take the opportunity to thank our readers for their patience during this time of disruption.